Cotswold Estate - Phase 1

Cotswolds

A full renovation of a large Oxfordshire Estate comprising of a 16th century Grade II listed Manor House and attached Barn, set in the heart of the Cotswolds. We worked alongside Interior Designers and Architects, who designed the project with an extremely high specification throughout.

This large renovation project was approached as two phases, focusing on the main house itself, and an attached barn which served as an entertaining suite and impressive living area for our clients.

New electrics, heating and hot water, and AV were fitted throughout, and a dedicated new plant room was created to house the infrastructure required of such an expansive property. Lutron lighting systems were installed throughout, providing the client with smart home features such as pre-set lighting scenes. Floors were removed to facilitate new under floor heating, and were replaced with the highest quality French limestone flooring, and wooden plank floors by Dinesen.

A very high specification kitchen by Obumex forms the heart of the house, and we constructed a new lime plaster rendered fireplace with bio-ethanol burner to complement this. New openings were created within the kitchen and the snug to house new bronze Crittall doors, and bespoke windows and doors were fitted throughout.

The dining room is located within a space which was a later addition to the house (used to link the original house with the barn), and previously featured a low level and visually heavy beam / truss. The roof was redesigned and structural works were carried out to remove this and make the ceiling above feel more open.

Lime plaster and lime render were used extensively during the renovation, and careful consideration was paid to the finishing around the original stone work to highlight these wonderful historical features. The house was decorated throughout using breathable paint that complements the colour of the Cotswold stone and natural elements.

The bathrooms throughout were renovated and given a refresh with new tiling and decorating, and had new sanitary ware fitted.

Cria Cotswold Estate Kitchen IMG004
Cria Cotswold Estate Phase 1 IMG002
Cria Cotswold Estate Phase 1 IMG003
Cria Cotswold Estate Phase 1 IMG006
Cria Cotswold Estate Phase 1 IMG005
Cria Cotswold Estate Phase 1 IMG001
Cria Cotswold Estate Phase 1 IMG002
Cria Cotswold estate IMG009
Cria Cotswold Estate Phase 1 IMG022
Cria Cotswold Estate Phase 1 IMG023
Cria Cotswold Estate Phase 1 IMG0010
Cria Cotswold Estate Snug IMG001
Cria Cotswold Estate Phase 1 IMG001
Cria_Cotswold Estate_Laundry_IMG001
Cria Cotswold Estate Phase 1 IMG011
Cria Cotswold Estate Phase 1 IMG014
Cria Cotswold Estate Phase 1 IMG017
Cria Cotswold Estate Phase 1 IMG013
Cria Cotswold Estate Phase 1 IMG012
Cria Cotswold Estate Phase 1 IMG018
Cria_Cotswold Estate_Bedroom_IMG001
Cria_Cotswold Estate_Bathroom_IMG005
Cria_Cotswold Estate_Bathroom_IMG006
Cria Cotswold Estate Phase 1 IMG019
Cria Cotswold Estate Phase 1 IMG021
Cria Cotswold Estate Phase 1 IMG016
Cria_Cotswold Estate_External_IMG003
Cria_Cotswold Estate_External_IMG004
Cria Cotswold Estate Phase 1 IMG020

BEFORE AND IN PROGRESS IMAGES

Cria Cotswold Estate External Before IMG002
Cria Cotswold Estate Phase 1 Construction IMG006
Cria Cotswold Estate Phase 1 Construction IMG001
Cria Cotswold Estate Kitchen Before IMG003
Cria Cotswold Estate Kitchen Before IMG002
Cria Cotswold Estate Phase 1 Construction IMG003
Cria Cotswold Estate Phase 1 Construction IMG008
Cria Cotswold Estate Phase 1 Construction IMG002
Cria Cotswold Estate Phase 1 Construction IMG007
Cria Cotswold Estate Phase 1 Construction IMG009
Cria Cotswold Estate Snug Before IMG001